home *** CD-ROM | disk | FTP | other *** search
/ The Way Things Work / Way Things Work, The (1994)(Dorling Kindersley).iso / article1 / cran / cran3z.dib (.png) < prev    next >
Bitmap Image  |  1994-04-22  |  42.2 KB  |  496x326  |  8-bit (56 colors)
   ocr: BUILDING THE CRANE The lirst section of the crane is climbing frane is lowered onto - this Ifixed and the fimly cab t0 011 the top - Joor. ofthat. The RLEMOVE FRARE / 2lachind climbing Jrame uses. a CLIMBING TUmL t0 lift the top ofthe crane. The crane then FRAME raises another section of the tower: into place. When the tower crane has 3, reached the required height the climbing frame is removed.